First Sorry for my English
My Problem: (i hope that U will understand me)
MM4 solve the sequence, 130 frames, (tracking and camera) perfect ( with a lot of points ) and everything was OK until director change the duration of a clip to 150 frames
When i open the file and replace the clip with the longer one ( replace is ok with same size and duration with original???) can't expand workarea
and when i import the second part of a sequence as Sequence02 i can't use the points tracked before (to continue tracking)
And the same when i import the tracking data in new project (file)
Please Please Help
I know that this can be done somehow
Don't want to start from zero